I've an existing paved patio location. I know that this will crack is the material is laid immediate. If I clear away the slabs and compact the sub foundation will this be sufficient to lay the porous substance on or do I would like ro concrete over and lay the https://travisaococ.look4blog.com/75803235/an-unbiased-view-of-resin-bound-installations